TECHNICAL APPLICATION GUIDELINES
How It Works
Exact mixing proportions, dilution formulations, and contractor procedures to guarantee 100% waterproof and structural results.
"Say Bye Bye to Dampness"
With Tuffcrete Cement, Total-Crete, and Polymer Modifiers, damp walls, peeling paint, and water infiltration are permanently prevented.
Interior Compounding / Screeding
Mix 10L Hydroshield Compounding Bond with 10kg Tuffcrete Cement to make a 100% waterproof screed paste.
Benefit: Leaves a glass-smooth, moisture-impervious interior wall ready for premium paint.
Exterior Weatherproof Compounding
Mix 10L Hydroshield Compounding Bond with 10kg Total-Crete Cement to form a weather-impervious exterior skim coat.
Benefit: Resists driving rain, wind-driven moisture, and exterior micro-cracking.
Tiling Walls & Floors with Total-Crete
Dilute Tuffcrete Polymer at 1L : 20L water. Mix Total-Crete Cement with the diluted polymer to your preferred trowel mortar consistency.
Tyrolean & Block Moulding
Add 1.5 Litres of Tuffcrete Polymer to each standard 50kg bag of cement in your block moulding or tyrolean mix.
Heavy Screed Plastering
Dilute 1L Polymer : 20L Water. Mix: 1 bag cement (50kg) + 10kg Tuffcrete powder + 10 headpans plaster sand (250kg) + 10 headpans sharp sand (250kg) with 20L diluted polymer.
100% Waterproof Concrete Casting
Combine 10kg Tuffcrete Powder to 50kg Cement. Dilute 1L Polymer into 20L water. Use with standard 1:2:4 design or 1:4:2 lightweight design.
Road Base Stabilization (SBS Protocol)
Axion Solid Base Stabilizer eliminates the need for expensive granite crushed rock base courses by biochemically improving the native in-situ soil:
- Tanker Dilution: Dilute 1L SBS to 300L water in a dedicated road water tanker.
- Bed Scarification: Scarify 25cm depth of the road base using a motorized grader equipped with a ripper.
- Uniform Soaking: Spray and thoroughly soak the loosened road base with the diluted SBS solution.
- Homogeneous Blading: Use the grader blade to windrow and mix the treated soil until completely homogenous.
- Shape & Crown: Lay the mixed material back onto the roadway to your specified cross-fall crown.
- Compaction Sequence: Compact with heavy steel-wheel roller 4 passes static (without vibration), followed by 4 passes with dynamic vibration (8 passes total).